電壓擊穿試驗(yàn)儀操作方式

點(diǎn)擊次數(shù):1539  更新時(shí)間:2017-06-12

電壓擊穿試驗(yàn)儀操作步驟:

1、試驗(yàn)前的準(zhǔn)備:1)打開(kāi)試驗(yàn)機(jī)右側(cè)的總電源開(kāi)關(guān),預(yù)熱15分鐘。2)打開(kāi)計(jì)算機(jī)進(jìn)入Windows系統(tǒng)。雙擊本儀器軟件的快捷圖標(biāo)打開(kāi)試驗(yàn)登錄界面輸入登錄密碼即可進(jìn)入試驗(yàn)界面。

2、交直流試驗(yàn)的切換1)本儀器高壓輸出為交流電壓。直流的獲得方式為在原回路中串入高壓硅堆,使測(cè)試回路為脈動(dòng)的直流電壓。實(shí)現(xiàn)的過(guò)程為,硅堆已經(jīng)在高壓變壓器的高壓絕緣塔中,平時(shí)用一個(gè)短路桿把高壓硅堆短接。需要直流試驗(yàn)時(shí),取出短路桿,使高壓硅堆接入測(cè)試電路中,這時(shí)回路的電壓為脈動(dòng)的直流電壓。

2)前面板直流交流選擇按鈕。該按鈕的狀態(tài)不能改變?cè)O(shè)備輸出的電壓性質(zhì)。按下該按鈕,設(shè)備僅僅是把直流報(bào)警電路接入。指示用戶,當(dāng)打開(kāi)箱門(mén)時(shí),您需要對(duì)高壓均壓球放電。轉(zhuǎn)動(dòng)放電桿,使放電桿的端部銅球接觸高壓均壓球。建議用戶每次放電銅球接觸高壓均壓球時(shí)間大于五秒。

3)試驗(yàn)的交直流電壓切換,主要取決于高壓絕緣塔中的短路桿是否取出。當(dāng)取出短路桿時(shí),高壓均壓球上的電壓為直流電壓,插入短路桿時(shí),高壓均壓球上的電壓為交流電壓。短路桿的取出、插入?yún)⒖醋髠?cè)的示意圖。

4)在直流試驗(yàn)時(shí),計(jì)算機(jī)也要選擇直流狀態(tài),否則測(cè)的結(jié)果是不正確的。簡(jiǎn)單的說(shuō),交流電壓與直流電壓有倍的關(guān)系。

 

電壓擊穿試驗(yàn)儀是高壓輸出設(shè)備,安裝搬動(dòng)使用應(yīng)特別注意人身與設(shè)備的安全。請(qǐng)注意以下事項(xiàng):

1 設(shè)備務(wù)必接16A單相220V交流電插座。

2 設(shè)備兩個(gè)接地端子之一務(wù)必通過(guò)地線導(dǎo)線接配電箱的地線。

3使用前,設(shè)備兩個(gè)接地端子之一務(wù)必接放電棒。

4 試驗(yàn)中,觀察檢測(cè)電流如果長(zhǎng)時(shí)間維持在20-30mA,應(yīng)立即停止試驗(yàn),以免負(fù)載過(guò)大燒毀保險(xiǎn)管。

5 一次試驗(yàn)完畢,務(wù)必先斷掉電源,再用放電棒放掉高壓輸出端的剩余電荷。

6 如遇緊急情況,應(yīng)立即按壓“急停”按鈕斷電。

7 長(zhǎng)時(shí)間不用,斷開(kāi)所有電源線。

8 搬運(yùn)時(shí)不能傾斜角過(guò)大,以免變壓器油流出。

9 換試樣前,確保已經(jīng)用放電棒放過(guò)電,且電源處于斷開(kāi)狀態(tài)。

10 測(cè)試過(guò)程如遇試樣著火,務(wù)必先斷電源,后滅火。

 

 

Operation procedure of voltage breakdown tester:
1. Preparation before test: 1) open the main power switch on the right side of the test machine and preheat for 15 minutes. 2) turn on the computer and enter the Windows system. Double click the instrument software shortcut icon, open the test login screen, enter the login password, you can enter the test interface.
2 、 AC and DC test switch 1) this instrument high voltage output is AC voltage. The way to obtain DC is to connect the high voltage silicon stack into the original circuit, so that the test circuit is a pulsating DC voltage. The implementation process, has been in a high voltage silicon stack transformer insulation tower, usually with a short rod, short circuit high-voltage silicon stack. When the DC test is needed, the short circuit rod is removed so that the high voltage silicon stack is connected to the test circuit, and the voltage of the circuit is a pulsating DC voltage.
2) front panel DC AC select button. The status of the button cannot change the voltage characteristic of the device output. Press this button, the device is only to connect the DC alarm circuit. Instructs the user when you open the door of the box, you need to discharge the ball evenly under high pressure. Turn off the pole so that the end of the pole is in contact with the high-pressure ball. It is recommended that each user discharge copper balls in contact with high pressure equal pressure ball for more than five seconds.
3) the AC / DC voltage switching of the test mainly depends on whether the short rod in the high voltage insulated tower is taken out. When the short circuit rod is taken out, the voltage on the ball is a direct current voltage, and when the short circuit rod is inserted, the voltage on the high voltage equalizing ball is an alternating voltage. Take out the short pole and insert it. See the diagram on the left.
4) in the DC test, the computer should also choose the DC state, otherwise the result of measurement is incorrect. In brief, the AC voltage is twice as much as the DC voltage.
Voltage breakdown test instrument is a high voltage output device. Installation, movement and use should pay special attention to the safety of people and equipment. Please note the following:
1 equipment must be connected to 16A single-phase 220V AC socket.
2 one of the two grounding terminals of the equipment must be connected to the ground wire of the distribution box through a dedicated earth wire.
3 before use, one of the two grounding terminals must be connected with the discharge rod.
4 in the test, if the observation current is maintained at 20-30mA for a long time, the test should be stopped immediay so as not to overload the fire tube.
5 a test finished, be sure to unplug the residual charge and then put off the high voltage output end of the bar.
6, in case of emergency, should immediay press "emergency stop" button, power failure.
7 do not use for a long time, disconnect all power lines.
8, handling can not tilt too large angle, so as not to transformer oil flow.
In 9 samples, make sure you've let the electric discharge rod, and the power is disconnected.
10 test process, in case of fire, be sure to break the power supply, and then extinguish the fire.

 

 

重點(diǎn)詞匯釋義

  • 擊穿試驗(yàn)breakdown test; flash (ing) test; spark-over test; disruptive test
  • 操作步驟operating steps
  • 快捷圖標(biāo)short-cut icon
  • 交流電壓alternating voltage
  • 高壓硅堆high voltage silicon rectifier stack; high-voltage silicon stack
  • 測(cè)試回路test loop; testing loop
  • 直流電壓volts d.c.; direct voltage
  • 高壓變壓器high tension transformer; high-voltage transformer (HVT); high voltage transformer
  • 高壓絕緣high-voltage insulation; high voltage insulation
  • 測(cè)試電路test circuit; test connection
聯(lián)系人:陳丹
手機(jī):
18911395947
點(diǎn)擊這里給我發(fā)消息
 
公与2个熄乱理在线播放| 国产精品无码久久久久| 欧美又色又爽又黄的视频| 欧美人伦禁忌DVD放荡欲情| 老师上课没戴奶罩看到奶头| 性欧美丰满熟妇XXXX性久久久 | 国产精品天干天干在线播放| 欧美亚洲国产精品久久高清| 久久偷看各类wc女厕嘘嘘偷窃| 公主从小被吃催乳药H| 双乳被老汉揉搓A毛片免费观看| 国产黄色视频| 狠狠躁18三区二区一区| 色综合99久久久无码国产精品| 国产中文字幕| 人妻丰满熟妇AⅤ无码| 无码人妻少妇色欲AV一区二区| 国产熟女老妇300部mp4| YIN荡护士揉捏乱P办公室视频 | 国产农村又大又粗A片| 少妇被多人C夜夜爽爽AV| 糖心VLOG精品一区二区| 丰满少妇被猛烈进入| 少妇被躁爽到高潮无码人狍大战| 精品国产一区二区三区久久| 孕妇高潮XXXXX孕妇| 国产毛a片啊久久久久久保和丸| 欧美老妇人与黑人做爰| 妈妈的朋友4在线观看| 国产国产国产国产系列| 麻豆免费视频网站入口在线观看| 69国产精品成人无码视频| 出轨H客厅激情嗯啊呻吟| 欧美69久成人做爰视频| 日本成AⅤ人片日本伦| 天堂中文8资源在线8| 精品国产一区二区三区AV| 免费国产又色又爽又黄的网站 | 国产AV老师与学生偷尝禁果| 亚洲成AV人片在线观看无码| 入禽太深免费完整版电影|